15:11:02 Europe / Stockholm

Bifogade filer

Kurs & Likviditet

Kursutveckling och likviditet under dagen för detta pressmeddelande

Prenumeration

Kalender

2024-11-08 Kvartalsrapport 2024-Q3
2024-08-15 Kvartalsrapport 2024-Q2
2024-05-08 Ordinarie utdelning COPP 0.00 SEK
2024-05-07 Kvartalsrapport 2024-Q1
2024-05-07 Årsstämma 2024
2024-02-29 Bokslutskommuniké 2023
2023-12-13 Split COPP 20:1
2023-11-30 Extra Bolagsstämma 2023
2023-11-07 Kvartalsrapport 2023-Q3
2023-08-30 Kvartalsrapport 2023-Q2
2023-05-12 Ordinarie utdelning COPP 0.00 SEK
2023-05-11 Kvartalsrapport 2023-Q1
2023-05-11 Årsstämma 2023
2023-03-08 Bokslutskommuniké 2022
2022-12-01 Extra Bolagsstämma 2022
2022-11-18 Kvartalsrapport 2022-Q3
2022-08-18 Kvartalsrapport 2022-Q2
2022-05-19 Ordinarie utdelning COPP 0.00 SEK
2022-05-18 Årsstämma 2022
2022-05-18 Kvartalsrapport 2022-Q1
2022-03-04 Bokslutskommuniké 2021
2021-10-14 Extra Bolagsstämma 2021
2021-08-19 Kvartalsrapport 2021-Q2
2021-05-20 Ordinarie utdelning COPP 0.00 SEK
2021-05-19 Årsstämma 2021
2021-03-29 Bokslutskommuniké 2020
2020-12-15 Extra Bolagsstämma 2020
2020-08-20 Kvartalsrapport 2020-Q2
2020-05-22 Ordinarie utdelning COPP 0.00 SEK
2020-05-20 Årsstämma 2020
2020-02-20 Bokslutskommuniké 2019
2019-08-28 Kvartalsrapport 2019-Q2
2019-05-15 Ordinarie utdelning COPP 0.00 SEK
2019-05-14 Årsstämma 2019
2019-02-21 Bokslutskommuniké 2018
2018-11-22 Kvartalsrapport 2018-Q3
2018-08-23 Kvartalsrapport 2018-Q2
2018-05-18 Ordinarie utdelning COPP 0.00 SEK
2018-05-17 Årsstämma 2018
2018-05-17 Kvartalsrapport 2018-Q1
2018-02-22 Bokslutskommuniké 2017
2017-11-23 Kvartalsrapport 2017-Q3
2017-08-24 Kvartalsrapport 2017-Q2
2017-05-17 Ordinarie utdelning COPP 0.00 SEK
2017-05-16 Årsstämma 2017
2017-05-16 Kvartalsrapport 2017-Q1
2017-02-19 Bokslutskommuniké 2016
2016-11-24 Kvartalsrapport 2016-Q3
2016-08-31 Kvartalsrapport 2016-Q2
2016-07-08 Extra Bolagsstämma 2016
2016-05-19 Årsstämma 2016
2016-05-19 Kvartalsrapport 2016-Q1
2016-05-08 Ordinarie utdelning COPP 0.00 SEK
2016-02-11 Bokslutskommuniké 2015
2015-11-26 Kvartalsrapport 2015-Q3
2015-08-20 Kvartalsrapport 2015-Q2
2015-05-08 Ordinarie utdelning COPP 0.00 SEK
2015-05-07 Årsstämma 2015
2015-05-07 Kvartalsrapport 2015-Q1
2015-02-12 Bokslutskommuniké 2014
2015-01-26 Extra Bolagsstämma 2015
2014-11-27 Kvartalsrapport 2014-Q3
2014-08-21 Kvartalsrapport 2014-Q2
2014-05-16 Ordinarie utdelning COPP 0.00 SEK
2014-05-15 Årsstämma 2014
2014-05-15 Kvartalsrapport 2014-Q1
2014-02-13 Bokslutskommuniké 2013
2013-11-28 Kvartalsrapport 2013-Q3
2013-09-13 Extra Bolagsstämma 2013
2013-08-15 Kvartalsrapport 2013-Q2
2013-05-17 Ordinarie utdelning COPP 0.00 SEK
2013-05-16 Årsstämma 2013
2013-05-16 Kvartalsrapport 2013-Q1
2013-02-21 Bokslutskommuniké 2012
2012-11-29 Kvartalsrapport 2012-Q3
2012-08-17 Extra Bolagsstämma 2012
2012-08-16 Kvartalsrapport 2012-Q2
2012-05-10 Kvartalsrapport 2012-Q1
2012-05-10 Årsstämma 2012
2012-02-23 Bokslutskommuniké 2011
2011-11-24 Kvartalsrapport 2011-Q3
2011-08-25 Kvartalsrapport 2011-Q2
2011-05-13 Ordinarie utdelning COPP 0.00 SEK
2011-05-12 Kvartalsrapport 2011-Q1
2011-05-12 Årsstämma 2011
2011-02-24 Bokslutskommuniké 2010
2010-11-25 Kvartalsrapport 2010-Q3
2010-06-21 Split COPP 100:1
2010-01-22 Ordinarie utdelning COPP 0.00 SEK
2010-01-21 Kvartalsrapport 2009-Q1
2010-01-21 Bokslutskommuniké 2009

Beskrivning

LandSverige
ListaMid Cap Stockholm
SektorRåvaror
IndustriGruvdrift & metaller
Copperstone Resources grundades 2006 och är ett bolag vars verksamhet ändrades 2019 till att fokusera på att återöppna Viscariagruvan i Kiruna för kopparutvinning. Bolagets förberedelsearbete innefattar prospektering i form av kärnborrning för att kvantifiera mineraltillgångar, entreprenadplanering samt upphandling av anrikningsverk och kringliggande infrastruktur. En nödvändig miljötillståndsansökan är inlämnad till Mark- och Miljödomstolen och ärendet är under behandling. Utöver Viscariagruvan har Copperstone bearbetningskoncessioner och undersökningstillstånd i Arvidsjaur, där prospektering pågår, och Smedjebacken.
2019-10-18 17:12:00

Kiruna October 18, 2019

Copperstone is pleased to announce that the assay results of VDD0201 and VDD0202 have been received from ALS laboratories and compiled by Copperstone, verified by the QP.

Highlights

  • The phase 1 on A zone shallow drilling has been successfully completed.
  • VDD0201, drilled outside of the mineral resource boundary, intersected significant copper mineralisation in the A main zone and the footwall lode, respectively 15m@0.73%Cu  from 40m and 6m@1.45%Cu from 103m downhole depth (65m vertically below surface).
  • VDD0202 intersected 18m@0.54%Cu from 27m downhole depth, including 3m at 1.85% Cu. This intercept fits very well with the A zone resources wireframe.
  • VDD0203 and VDD0204 assaying pending.
  • D zone deep exploration started with VDD0205 planned depth 1,000m.

Copperstone’s first drill campaign on the Viscaria property commenced on September 17, 2019, and confirmed the veracity of the historic shallow copper deposit and intersected significant copper mineralisation at the footwall lode. VDD0201 was drilled for four days and stopped as planned at 150m. VDD0202 was drilled for three days and stopped as planned at 70m.

VDD0201 details:

VDD0201 is drilled from the hanging wall to the footwall of the A zone mineralisation, outside the boundary of the current Mineral Resource, i e potentially adding mineralised tonnage. Copperstone intersected two significant shallow mineralizations, previously not included in the resource wireframe:

  • The A main zone: Copperstone intersected a broad mineralisation of  39m@0.43%Cu from 40m downhole, included two continuous mineralisation zones:
    • The first zone   15m@0.73%Cu from 41m. This zone is likely the  same mineralisation lode as was historically intersected by drill holes D-8149 ad D-8507, respectively 15m@1.2%Cu from 34m downhole and 6m@1.8%Cu from 46m downhole.
    • The second zone intersected 10m@0.46%Cu from 69m downhole.
  • The A footwall lode: Intersected 6m@1.45%Cu from 103m downhole depth.

VDD0202 details:

      ·VDD0202 is drilled to test the veracity of the historic drill assay. The hole intersected 18m@0.54%Cu from 27m, including 3m at 1.85% Cu from 41m downhole.This intercept fit very well with the A zone mineralisation wireframe. In this section, Copperstone has evidence of the  footwall lode by D-3167 which intersected 8m@0.4%Cu from 87m.

“The success of this first drilling campaign at A zone give us high confidence to plan a strategic low risk activity. We will immediately move forward to the next step by planning shallow drilling, to follow up the significant hanging wall and footwall lodes. This data will be valuable to reinterpret and re estimate the A zone shallow resources, prior to the feasibility studies. We are confident that the resources will significantly improve.”, comments Maurice Zongo, Project Geologist.

“The first lab assay results from A zone drilling are very encouraging.  It confirms both that the historical drilling assay data is reliable, and that the shallow mineralisation at A zone does indeed exist and can be increased. We are already planning for the next shallow drill campaign. This while the awaiting the assays from VDD0203 and VDD0204. Meanwhile, the D-zone drillings could be approaching its exploration target.”, comments CEO Michael Mattsson.

Please see attached pdf for the complete information.

For further information, please contact Michael Mattsson (CEO) at +46(0)580-88890, or info@copperstone.se or refer to Copperstone webpage: www.copperstone.se.

This press release contains insider information which Copperstone Resources AB (publ) is obliged to publish according to the EU market abuse regulation (MAR). The information was delivered by the above-mentioned contact for publishing October 18, 2019 at 17:12 CET.

About Copperstone

Copperstone is a public company trading as COPP B on Nasdaq First North Growth Market in Stockholm, Sweden. The Certified Adviser is Augment Partners AB, info@augment.se, +46 8 505 65 172. The Company is focused on base and precious metal exploration in the vicinity of the internationally recognized mining districts of Kiruna and the Skellefte-field in northern Sweden. In addition, the Company also owns an exploitation concession in the Bergslagen mining region, in central Sweden.

Qualified Person

The technical information herein has been reviewed by the Qualified Person of the Company (QP) Thomas Lindholm M. Sc., GeoVista AB, Luleå.

Forward looking statements

The information in this press release may contain forward-looking statements, which relate to future events or future performance and reflect Copperstone’s current expectations and assumptions. Such forward-looking statements reflect Copperstone’s current beliefs and are based on assumptions made by and information currently available to the Company.

Investors are cautioned that these forward-looking statements are neither promises nor guarantees, and are subject to risks and uncertainties that may cause future results to differ materially from those expected.

These forward-looking statements are made as of the date hereof and, except as required under applicable securities legislation, the Company does not assume any obligation to update or revise them to reflect new events or circumstances.

Please note drill intercepts are quoted as drilled and are not corrected for true thickness as the shape of the orebodies is not yet known.

 