Beskrivning
Land | Kanada |
---|---|
Lista | First North Stockholm |
Sektor | Råvaror |
Industri | Gruvdrift & metaller |
Vancouver, BC, November 10, 2023 /CNW/: Filo Corp. (TSX: FIL) (Nasdaq First North Growth Market: FIL) (OTCQX: FLMMF) ("Filo", or the "Company") announces its results for the three and nine months ended September 30, 2023.
Jamie Beck, President & CEO, commented, "We have successfully continued our nine-rig drilling campaign through the South American winter season with limited impact on drilling productivity. The winter campaign yielded some of the best results of the year, materially increasing the area of known mineralization and identifying additional high-grade zones. Multiple holes support the idea of a continuous mineralization between the Aurora and Bonita Zones. We enter the spring with optimism that our exploration efforts will continue to grow the size, and demonstrate the strategic nature, of the deposit."
Q3 2023 Highlights- Continued exploration success, highlighted by:
- Assay results announced for hole FSDH091 resulted in the first intersection of a high-grade zone near the Bonita Zone, and the first instance of consistent grades greater than 1% CuEq outside of the Aurora Zone. FSDH091 included a high-grade section averaging 1.15% CuEq over 212m. At over 1km north of the Aurora Zone, the results from this hole open up an entirely new area to explore for high-grade mineralization;
- Hole FSDH090, collared 730m to the south of FSDH091, intersected 1,518.5m at 0.48% CuEq and intersected a number of high-grade sulphide veins over the upper several hundred metres, similar to those seen in FSDH087. This includes a 22m intersection of 490.8g/t silver which may correlate with a 16m interval of 4.73% CuEq (including 50g/t silver) 300m away in FSDH087;
- Assay results announced for FSDH088, collared in the Filo sector, included 992.0m at 0.63% CuEq from 66.0m, including 582.0m at 0.73% CuEq from 436.0m. Hole FSDH088, which is south of Aurora and 2.5km south of FSDH091, demonstrates the considerable size of the deposit;
- Assay results announced for hole FSDH084 resulted in the second-best hole from a grade-thickness perspective ever drilled at the Filo del Sol Project. The results of hole FSDH084 confirm the continuity of high-grade mineralization within the Aurora Zone, including the high-grade Breccia 41 Zone;
- The assay results of FSDH091, FSDH090 and FSDH087 support the idea of continuous mineralization across the 1.3km distance between the Aurora and Bonita Zones. Additional holes in this area are underway, which will provide critical information on the continuity of mineralization from Tamberias in the south to Bonita in the north (a distance of over five kilometers);
- Assay results announced from the Company's geotechnical drilling program, carried out in support of the Company's studies of a potential underground adit to provide platforms to more efficiently drill out the Aurora Zone and Breccia 41:
- Results from hole FSGT006 returned several mineralized intersections, including 12m at 5.21 g/t Au at shallow depth. This hole is 600m to the east of the nearest hole into the Filo del Sol deposit and, although copper values are uniformly low, it indicates that peripheral alteration and mineralization extend to this area;
- Five holes were drilled in total for a cumulative 1,597m. Consistent with the results of the Company's 2023 geophysical surveys, the geotechnical drilling results confirm the presence of strong hydrothermal alteration extending as far as 2km to the east of the Aurora Zone, which opens up a large area of prospective ground for additional exploration.
Q3 2023 Drilling and Assay Results
Drilling and assay results disclosed by the Company during and subsequent to the first three quarters of 2023 are summarized in Appendix 1 to this news release.
Outlook
Drilling continues to be the Company's primary focus with nine drill rigs at site. Drilling will remain a mix of both large and small step-outs to the north and south of the Aurora Zone, as well as resource definition drilling within it. The Company continues to maintain a strong focus on improving drill productivity through a variety of initiatives.
Data collected from the current campaign is being used to develop a comprehensive geological model which will guide further exploration and form the basis of an eventual update to the Mineral Resource estimate. The Company is continuing preliminary metallurgical testwork on the sulphide mineralization, as well as environmental and social baseline programs in support of future project permitting.
The Company's plans and timelines are subject to equipment and staff availability, along with being able to operate safely and effectively in accordance with the Company's health and safety protocols.
Selected Financial Information
(in thousands of September December
Canadian dollars) 30, 31,
2023 2022
Cash and cash 134,178 74,915
equivalents
Working capital 119,619 60,296
Mineral 10,385 9,737
properties
Total assets 149,929 85,964
The financial
information in
this table was
selected from the
condensed interim
consolidated
financial
statements for
the three and
nine months ended
September 30,
2023, which are
available on
SEDAR+ at
www.sedarplus.ca
and at the
Company's website
www.filocorp.com
Financial Results
[][]
(in thousands of Canadian dollars, except Three Nine
per share amounts) months months
ended ended
September September
30, 30,
2023 2022 2023 2022
Exploration and project investigation 36,657 19,915 106,845 56,919
General and administration ("G&A"), 1,708 2,327 5,751 3,932
excluding share-based compensation
expense[(1)]
Share-based compensation expense[(1)] 1,682 3,996 7,122 7,451
Net loss 23,379 20,040 82,956 47,953
Basic and diluted loss per share 0.18 0.16 0.66 0.40
1. Share based compensation is a non
-cash cost which reflects the
amortization of the estimated fair value
of share options over their vesting
period. The fair value of share options
is calculated using the Black-Scholes
pricing model, which relies heavily on
the Company's share price and historical
share price volatility. Due to the
material increase in the Company's share
price and volatility since 2021, the
calculated fair value of the Company's
share options has increased considerably,
resulting in a higher share option value
and resultant share-based compensation
expense being recognized. A portion of
this expense is included in Exploration
and Project Investigation expense.
The financial information in this table
was selected from the Company's condensed
interim consolidated financial statements
for the three and nine months ended
September 30, 2023, which are available
on SEDAR+ at www.sedarplus.ca and the
Company's website www.filocorp.com
For the three and nine months ended September 30, 2023, Filo incurred net losses of $23.4 million and $83.0 million, respectively (2022 - $20.0 million and $48.0 million) including operating losses of $39.7 million and $118.4 million (2022 - $26.2 million and $66.9 million) and net gains of $13.7 million and $31.0 million from the use of marketable securities (2022 - $4.0 million and $16.6 million). Exploration and project investigation costs are generally the most significant expenses for the Company and for the three and nine months ended September 30, 2023, they accounted for approximately 92% and 90% of the operating losses, respectively (2022 - 76% and 85%). The Company expenses its exploration costs through the consolidated statement of comprehensive loss, except for mineral property option payments and mineral property acquisition costs, which are capitalized.
Liquidity and Capital Resources
As at September 30, 2023, the Company had cash and cash equivalents of $134.2 million and net working capital of $119.6 million, compared to cash and cash equivalents of $74.9 million and net working capital of $60.3 million as at December 31, 2022. The increase in the Company's cash and cash equivalents and net working capital is due the non-brokered private placement completed in June 2023 which resulted in net proceeds of $129.1 million, plus the net $1.1 million BHP Top-Up and $4.6 million in gross proceeds received by the Company in relation to the exercise of stock options during the nine months ended September 30, 2023. These cash inflows were offset by funds used in operations and for general corporate purposes, plus amounts used in the acquisition of mineral properties ($1.0 million) and equipment and facilities for the Filo del Sol Project ($3.9 million).
The Company will continue to deploy the majority of Its treasury to fund ongoing advancement of the Filo del Sol Project, and to a lesser extent, for working capital and general corporate purposes.
About Filo del Sol
Filo del Sol is a high-sulphidation epithermal copper-gold-silver deposit associated with one or more large porphyry copper-gold systems. Overlapping mineralizing events combined with weathering effects, including supergene enrichment, have created several different styles of mineralization, including structurally controlled and breccia-hosted gold, manto-style high-grade silver (+/- copper) and high-grade supergene enriched copper within a broader envelope of disseminated, stockwork and breccia-hosted sulphide copper and gold mineralization. This complex geological history has created a heterogeneous orebody which is characterized by zones of very high-grade copper +/- gold +/- silver mineralization within a large envelope of more homogeneous, lower-grade mineralization.
Technical Information
Copper Equivalent is calculated based on US$ 3.00/lb Cu, US$ 1,500/oz Au and US$ 18/oz Ag, with 80% metallurgical recoveries assumed for all metals. The formula is: CuEq % = Cu % + (0.7292 * Au g/t) + (0.0088 * Ag g/t).
Mineralized zones within the Filo del Sol deposit are typically flat-lying, or bulk porphyry-style zones and drilled widths are interpreted to be very close to true widths.
Samples were cut at Filo's operations base near the town of Guañizuil, Argentina by Company personnel. Diamond drill core was sampled in 2 metre intervals (except where shortened by geological contacts) using a rock saw for sulphide mineralization. Oxide mineralization was cut with a core splitter in order to prevent dissolution of water-soluble copper minerals during the wet sawing process. Core diameter is a mix of PQ, HQ and NQ depending on the depth of the drill hole. RC samples were collected at the drill site by Company personnel with splitting carried out at the Company's field camp near the drill sites. Individual samples represent final splits from 2 metre intervals down the hole. Samples were bagged and tagged and packaged for shipment by truck to the ALS preparation laboratory in Mendoza, Argentina where they were crushed and a 500g split was pulverized to 85% passing 200 mesh. The prepared samples were sent to the ALS assay laboratories in either Lima, Peru or Santiago, Chile for copper, gold and silver assays, and multi-element ICP and sequential copper analyses. ALS is an accredited laboratory which is independent of the Company. Gold assays were by fire assay fusion with AAS finish on a 30g sample. Copper and silver were assayed by atomic absorption following a 4-acid digestion. Samples were also analyzed for a suite of 36 elements with ICP-ES and a sequential copper leach analysis was completed on each sample with copper greater than 500ppm (0.05%). Copper and gold standards as well as blanks and duplicates (field, preparation and analysis) were randomly inserted into the sampling sequence for Quality Control. On average, 9% of the submitted samples are Quality Control samples. No data quality problems were indicated by the QA/QC program.
Details on assay procedures and the drill intersections provided in Appendix 1 can be found in the Company's news releases dated January 10, 2023, February 2, 2023, March 16, 2023, April 13, 2023, April 13, 2023, May 30, 2023, July 4, 2023, July 11, 2023, August 21, 2023, September 5, 2023 and October 25, 2023.
Qualified Persons
The scientific and technical disclosure for the Filo del Sol Project included in this news release have been reviewed and approved by Bob Carmichael, P.Eng. and Jamie Beck, P. Eng. Mr. Carmichael is Filo's Vice President of Exploration and a Qualified Person under National Instrument 43-101 Standards of Disclosure of Mineral Projects ("NI 43-101"). Mr. Beck is Filo's President and CEO and is also a Qualified Person under NI 43-101.
Additional Information
The Company's condensed interim consolidated financial statements for the three and nine months ended September 30, 2023 and related management's discussion and analysis are available on SEDAR+ at www.sedarplus.ca and the Company's website at www.filocorp.com.
The Company's certified adviser on the Nasdaq First North Growth Market is Aktieinvest FK AB, +46 8 506 51703, rutger.ahlerup@aktieinvest.se.
The information contained in this news release was accurate at the time of dissemination but may be superseded by subsequent news release(s). The Company is under no obligation, nor does it intend to update or revise the forward-looking information, whether as a result of new information, future events or otherwise.
This information was submitted by Filo Corp. for publication, through the agency of the contact person set out below, on November 10, 2023 at 08:00 pm EST.
On behalf of Filo,
Jamie Beck
President and CEO
APPENDIX 1 - Q3 2023 DRILLING AND ASSAY RESULTS
Drilling and assay results disclosed by the Company during and subsequent to the first three quarters of 2023 are summarized in the following table:
[]
Hole-ID From (m) To Length Cu Au Ag CuEq[1]
(m) (m) (%) (g/t) (g/t) (%)
FSDH068A 18.0 1,794.0 1,776.0 0.45 0.30 4.0 0.70
incl. 54.0 94.0 40.0 0.65 0.92 8.1 1.39
incl. 394.0 1,514.0 1,120.0 0.59 0.38 5.3 0.92
incl. 574.0 1,298.2 724.2 0.69 0.45 6.8 1.08
FSDH069A 138.0 1,434.5 1,296.5 0.60 0.38 13.9 1.00
incl. 404.0 435.0 31.0 0.00 0.27 127.0
and incl. 498.0 1,096.0 598.0 0.92 0.57 19.3 1.51
incl. 792.0 886.0 94.0 1.78 1.37 26.3 3.01
FSDH070A 282.0 1,338.5 1,056.5 0.54 0.38 4.0 0.86
incl. 369.7 1,040.0 670.4 0.63 0.41 5.3 0.97
incl. 540.0 712.0 172.0 0.75 0.47 5.9 1.15
FSDH071 292.0 1,320.0 1,028.0 0.78 0.47 6.7 1.16
incl. 408.0 580.0 172.0 1.44 0.82 12.6 2.14
incl. 514.0 574.0 60.0 2.18 1.64 16.9 3.53
incl. 776.0 1,013.5 237.5 1.04 0.68 6.0 1.49
FSDH072 484.0 1,712.0 1,228.0 0.55 0.33 4.4 0.83
incl. 650.0 1,472.0 822.0 0.68 0.42 4.4 1.02
incl. 998.0 1,328.0 330.0 0.88 0.61 2.3 1.35
FSDH073 404.5 1,388.4 983.9 0.62 0.32 4.0 0.89
incl. 600.0 1,214.0 614.0 0.74 0.41 3.2 1.06
incl. 756.0 1,028.0 272.0 0.92 0.52 3.2 1.33
FSDH074 278.0 1,300.0 1,022.0 0.49 0.19 4.4 0.66
incl. 644.0 1,160.0 516.0 0.61 0.21 3.2 0.79
incl. 840.0 1,092.0 252.0 0.65 0.23 3.6 0.85
FSDH075 197.1 1,562.0 1,364.9 0.31 0.12 2.9 0.42
incl. 197.1 268.0 70.9 0.33 0.19 15.4 0.60
and incl. 796.0 1,562.0 766.0 0.40 0.13 1.3 0.51
incl. 910.4 1,202.0 291.6 0.52 0.18 1.2 0.66
FSDH076 180.0 1,543.0 1,363.0 0.48 0.35 3.9 0.77
incl. 496.0 850.9 354.9 0.63 0.40 10.0 1.01
and incl. 952.0 1,120.0 168.0 0.52 0.48 1.1 0.88
and incl. 1264.0 1,490.0 226.0 0.55 0.42 1.2 0.87
FSDH077 192.0 194.0 2.0 0.05 10.35 0.5
plus 404.0 920.2 516.2 0.11 0.11 0.9 0.20
FSDH079 68.0 76.0 8.0 0.25 0.40 8.9 0.61
FSDH080 122.0 1,347.5 1,225.5 0.39 0.29 8.9 0.67
incl. 122.0 1,058.0 936.0 0.42 0.33 11.3 0.77
incl. 122.0 216.0 94.0 1.02 0.42 5.8 1.38
incl. 126.0 148.0 22.0 2.25 0.35 1.0 2.51
and incl. 494.0 882.0 388.0 0.39 0.36 20.7 0.83
FSDH081 192.0 242.0 50.0 0.16 0.13 7.2 0.32
FSDH082 No
significant
values
FSDH083 418.7 1,549.8 1,131.1 0.43 0.15 2.8 0.57
incl. 560.0 672.0 112.0 0.52 0.17 6.2 0.70
and incl. 970.0 1,180.0 210.0 0.61 0.22 2.1 0.80
FSDH084 170.0 1,575.8 1,405.8 0.62 0.43 23.2 1.13
incl. 394.0 440.0 46.0 0.01 0.38 310.2
and incl. 616.0 1,258.0 642.0 1.01 0.70 20.6 1.70
incl. 772.0 827.8 55.8 2.98 2.73 92.8 5.79
incl. 778.0 812.0 34.0 3.68 3.73 110.5 7.37
FSDH085 18.0 26.0 8.0 0.98 3.15 433.8 7.09
plus 320.0 1,199.0 879.0 0.32 0.13 6.0 0.47
incl. 658.0 1,114.4 456.4 0.38 0.14 5.8 0.53
incl. 658.0 667.0 9.0 0.33 0.07 156.8 1.76
FSDH087 42.0 1,472.0 1,430.0 0.40 0.16 4.3 0.55
incl. 292.0 1,472.0 1,180.0 0.46 0.17 3.7 0.61
incl. 190.0 194.0 4.0 1.41 0.33 49.9 2.09
and incl. 232.0 233.0 1.0 2.04 1.02 6.6 2.84
and incl. 300.0 304.0 4.0 4.49 4.10 147.0 8.77
and incl. 350.0 442.0 92.0 0.75 0.40 11.3 1.14
incl. 358.0 374.0 16.0 2.97 1.81 50.1 4.73
incl. 436.0 440.0 4.0 1.58 0.41 33.0 2.17
and incl. 937.5 940.0 2.5 2.00 0.48 145.2 3.63
FSDH088 66.0 1,058.0 992.0 0.36 0.32 3.7 0.63
incl. 436.0 1,018.0 582.0 0.41 0.38 5.4 0.73
FSDH090 100.0 1,618.5 1,518.5 0.31 0.11 10.3 0.48
incl. 108.0 130.0 22.0 0.07 0.06 490.8
and incl. 268.7 272.0 3.3 2.64 0.92 127.2 4.43
and incl. 539.1 540.0 0.9 2.66 2.04 132.6 5.31
and incl. 665.0 1,322.0 657.0 0.44 0.14 2.0 0.56
FSDH091 168.0 1,536.0 1,368.0 0.40 0.19 2.5 0.56
incl. 185.5 200.0 14.5 0.42 0.97 30.2
and incl. 504.0 508.0 4.0 1.94 1.20 9.8 2.90
and incl. 672.8 1,510.0 837.2 0.53 0.21 1.9 0.70
incl. 872.0 1,084.0 212.0 0.84 0.40 2.2 1.15
FSGT006 36.0 48.0 12.0 0.07 5.21 14.1
incl. 40.0 44.0 4.0 0.09 10.25 18.8
1. Copper
Equivalent is
calculated
based on US$
3.00/lb Cu,
US$ 1,500/oz
Au and US$
18/oz Ag,
with 80%
metallurgical
recoveries
assumed for
all metals.
The formula
is: CuEq % =
Cu % +
(0.7292 * Au
g/t) +
(0.0088 * Ag
g/t)
- FSDH086
- FSDH089
Assay results for these holes will be released as they are received, analyzed and confirmed by the Company.
Cautionary Note Regarding Forward-Looking Statements
Certain statements made and information contained herein in the news release constitutes "forward-looking information" and "forward-looking statements" within the meaning of applicable securities legislation (collectively, "forward-looking information"). The forward-looking information contained in this news release is based on information available to the Company as of the date of this news release. Except as required under applicable securities legislation, the Company does not intend, and does not assume any obligation, to update this forward-looking information. Generally, this forward-looking information can frequently, but not always, be identified by use of forward-looking terminology such as "plans", "expects" or "does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "projects", "budgets", "assumes", "strategy", "goals", "objectives", "potential", "possible", "anticipates" or "does not anticipate", or "believes", or variations of such words and phrases or statements that certain actions, events, conditions or results "will", "may", "could", "would", "should", "might" or "will be taken", "will occur" or "will be achieved" or the negative connotations thereof. All statements other than statements of historical fact may be forward-looking statements.
The Company believes that the expectations reflected in the forward-looking information included in this news release are reasonable, but no assurance can be given that these expectations will prove to be correct and such forward-looking information should not be unduly relied upon. Information contained in this news release is as of the date of this press release. In particular, this press release contains forward-looking information pertaining to assumptions made in the interpretation of drill results, geology, grade, geochemistry, potential implications of geophysics interpretations, and continuity of mineral deposits; expectations regarding access and demand for equipment, skilled labour and services needed for exploration and development of mineral properties; and that activities will not be adversely disrupted or impeded by exploration, development, operating, regulatory, political, community, economic, environmental and/or healthy and safety risks. In addition, this news release may contain forward-looking statements or information pertaining to: potential exploration upside at the Filo del Sol Project, including the extent and significance of the porphyry copper-gold system underlying the current Mineral Resource and the prospectivity of exploration targets; exploration and development plans and expenditures, including a transition to year-round operations and the timing thereof; the ability of the Company's COVID-19 operating protocol to continue to meet government-mandated health and safety guidelines enabling it to conduct its field programs as planned; the success of future exploration activities; potential for resource expansion; ability to build shareholder value; expectations with regard to adding to its Mineral Reserves or Resources through exploration; expectations with respect to the conversion of inferred resources to an indicated resources classification; ability to execute planned work programs; plans or ability to add additional drill rigs; timing or anticipated results of an update to the mineral resource estimate for Filo del Sol; government regulation of mining activities; environmental risks; unanticipated reclamation expenses; title disputes or claims; limitations on insurance coverage; and other risks and uncertainties.
Statements relating to "mineral resources" are deemed to be forward-looking information, as they involve the implied assessment, based on certain estimates and assumptions that the mineral resources described can be profitably produced in the future.
The forward-looking statements contained in this news release are made as at the date of this news release and Filo does not undertake any obligations to publicly update and/or revise any of the included forward-looking statements, whether as a result of additional information, future events and/or otherwise, except as may be required by applicable securities laws. Forward-looking information is provided for the purpose of providing information about management's current expectations and plans and allowing investors and others to get a better understanding of the Company's operating environment. Forward-looking information is based on certain assumptions that the Company believes are reasonable, including that the current price of and demand for commodities will be sustained or will improve, the supply of commodities will remain stable, that the general business and economic conditions will not change in a material adverse manner, that financing will be available if and when needed on reasonable terms and that the Company will not experience any material labour dispute, accident, or failure of plant or equipment. These factors are not, and should not be construed as being, exhaustive. Although the Company has attempted to identify important factors that would cause actual results to differ materially from those contained in forward-looking information, there may be other factors that cause results not to be as anticipated, estimated, or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. All the forward-looking information contained in this document is qualified by these cautionary statements. Readers are cautioned not to place undue reliance on forward-looking information due to the inherent uncertainty thereof.
Follow Us
Twitter: https://twitter.com/filo_corp
LinkedIn: https://www.linkedin.com/company/filocorp/
Instagram: https://www.instagram.com/filo_corp/
Facebook: https://www.facebook.com/FiloCorpOfficial
View PDF Version (https://mb.cision.com/Public/17167/3874033/902287953b699132.pdf)